Constructing the civil foundation for a spiral welded pipe mill is a precision‑demanding project that requires professional expertise. Since these pipe‑welding units are non‑standard equipment, there is no fully unified national standard. Therefore, the construction must strictly rely on the foundation drawings and installation instructions provided by the equipment manufacturer.
Below are the core construction points, compiled from relevant sources, for your reference.
Before the equipment arrives on site, you should obtain detailed foundation drawings from the manufacturer. These drawings are the sole basis for construction and include:
Exact positions of foundation anchor bolts
Location of each mechanical component
Dimensions, strength requirements, and depth of the foundation
Carefully study these drawings before starting any work.
Survey and layout – According to the foundation drawings, precisely mark the outline of the foundation and the centreline of the equipment installation on site.
Excavation and subgrade treatment – Excavate to the required depth and dimensions as per the drawings. For special conditions (e.g., building over a water pit), you may need to design dedicated support structures.
Reinforcement bar placement and formwork erection – Place reinforcing bars in the excavated pit and erect formwork in preparation for concrete pouring.
Precise fixing of embedded parts – This is one of the most critical steps. Strictly follow the drawings to fix anchor bolts, steel plates, and other embedded items at their designed positions. Even slight deviations can prevent subsequent equipment installation.
A special case: One patented technique describes an improved foundation structure that pre‑sets recesses in the equipment foundation, positions horizontal H‑beams with 50‑mm‑thick steel plate inserts fixed on top, and then pours the foundation columns, enabling construction over difficult terrain such as water pits.
Concrete pouring and curing – Pour the concrete, ensuring sufficient thickness and compressive strength. After pouring, cure it properly to achieve the designed strength.
Secondary grouting – After the equipment has been roughly positioned and adjusted for precision, perform secondary grouting of the anchor bolt holes to fill and level them.
After the foundation is completed and before equipment installation, a strict inspection and acceptance procedure must be carried out:
Concrete quality – It must comply with the relevant provisions of the Chinese standard Code for Acceptance of Construction Quality of Concrete Structures (GB 50204), and acceptance records and documentation should be available.
Position and dimensions – Re‑check the position, dimensions, etc., of the foundation according to the specified requirements.
Centre of gravity alignment – The equipment centre of gravity and the foundation centre of gravity must lie on the same vertical line. Permissible deviations are strictly defined (e.g., within 3%–5% of the distance from the foundation centre to its edge).
Lack of a unified standard – Because the equipment is non‑standard, design and construction experience are essential. Seek engineers or teams with relevant experience.
Precision of embedded parts – The positioning of embedded parts is key to the final installation accuracy and must be repeatedly verified.
Foundation strength – The foundation must have “sufficient thickness and adequate compression resistance” to withstand the heavy dynamic loads generated during operation.
Safety facilities – In areas where personnel operate and move, install safety guards, ladders, and other protective measures.
National standards – Refer to Code for Design of Welded Pipe Process (GB 50468‑2008) and Code for Construction and Acceptance of Welded Pipe Equipment Installation.
Professional drawings – Online resources, such as “Foundation drawings for rear‑swing spiral welded pipe mill units”, are available for reference, but always base your work on the drawings provided by your equipment manufacturer.
In summary, the key points for building a civil foundation for a spiral welded pipe mill are: strictly follow the manufacturer’s drawings as the sole criterion, rigorously control the installation accuracy of embedded parts, and ensure the foundation has adequate strength and stability. This is a technically demanding task, and it is strongly recommended to entrust it to an experienced professional team.